Skip to main content

Tradie Tools calculator

Tradie Quote Calculator

Build a simple tradie quote from labour, materials, extra costs, markup, and optional GST so you can price jobs faster and more consistently.

Why use it

  • Useful for simple quoting when you want one clear total built from labour, materials, and markup.
  • Markup is applied after labour, materials, and additional direct job costs are combined.
  • The GST toggle helps you show either an ex-GST or GST-inclusive quote total quickly.

Calculator tool

Use the tradie quote calculator

Build a simple tradie quote from labour, materials, extra costs, markup, and optional GST so you can price jobs faster and more consistently.

Use the calculator

Results update instantly as you type.

Enter the total labour hours expected for the job.

hrs

Enter the hourly labour charge or internal labour recovery rate you want to quote from.

$

Enter the expected material cost for the job.

$

Optional. Include travel, subcontractors, skip fees, permits, or other direct job costs.

$

Optional. Enter the markup percentage you want to add on top of the job cost base.

%

Switch GST on if you want the final quote total to include the standard 10% GST amount.

GST included in final quote

Result updates live below as you type.

Share this result

Email it to yourself, send it to a customer, or copy the figures into a quote — all without an account.

Email this result

placeholder

“Email this” opens your own email app (Gmail, Outlook, Apple Mail) with the figures and a link back already filled in. Nothing is sent through BizTools.au.

Important note

BizTools.au is designed to make business numbers easier to check, but calculator outputs still need judgment and real-world context.

  • Calculator results are general estimates only and depend on the figures entered.
  • Examples and summaries are provided for general information, not legal, tax, accounting, payroll, or financial advice.
  • Before relying on a result for a real decision, check your assumptions and get qualified advice where needed.
Read the full site disclaimer

How it works

Understand the formula before you use the result

The calculator uses a simple working formula so you can sense-check the result quickly and explain it clearly inside your business.

Tradie quote formula

Labour total = labour hours × labour rate

Subtotal before markup = labour total + material cost + additional costs

Markup amount = subtotal before markup × markup %

Subtotal after markup = subtotal before markup + markup amount

GST amount = subtotal after markup × 10% if GST is enabled

Final quote total = subtotal after markup + GST amount

This is a simple estimating tool for building a quote figure quickly. You can still adjust for risk, call-out minimums, scope gaps, or project-specific terms.

Worked example

See the numbers in a realistic scenario

Use the example below as a sense check when you compare the calculator result to a real quote, sale, or pricing decision.

Worked example

Worked example: quoting a small trade job

A tradie expects 8 labour hours at $110 per hour, $350 of materials, $90 of extra costs, 20% markup, and wants GST included.

  • Labour hours: 8
  • Labour rate per hour: $110
  • Material cost: $350
  • Additional costs: $90
  • Markup: 20%
  • GST included: Yes

Calculation steps

  1. Labour total = 8 × $110 = $880
  2. Subtotal before markup = $880 + $350 + $90 = $1,320
  3. Markup amount = $1,320 × 20% = $264
  4. Subtotal after markup = $1,320 + $264 = $1,584
  5. GST amount = $1,584 × 10% = $158.40
  6. Final quote total = $1,584 + $158.40 = $1,742.40

The job quote comes to $1,742.40 including GST, based on the entered labour, materials, costs, and markup.

FAQ

Common questions about the tradie quote calculator

These are the practical questions operators usually run into when they apply the result to a real business decision.

Should I use markup or margin on a quote?

Many tradies think in markup because they start from labour and material cost. It is still worth checking margin separately if you want to protect profitability consistently.

What should I include in additional costs?

Typical extras include travel, waste removal, equipment hire, subcontractors, permits, parking, or other direct job costs not already in labour or materials.

What happens if I turn GST off?

The final quote total will remain ex-GST, which can be useful for internal estimating or where you need to show the pre-GST figure first.

Related guides

Guides for Tradie Tools

Use these articles if the result needs more context before you change a quote, price, staffing decision, or cost assumption.

We use cookies for site analytics, and (later) advertising, to keep BizTools.au free. You can accept or decline — your choice is remembered on this device. Read our Privacy Policy.